Conference Day One: Wednesday, 24 November 2010

08:30 Day One Registration & Welcome Coffee

09:00 Opening Remarks From The Chair

09:10 Design And Evaluation Of Groundwater Management System Of The River Crossing Long Tunnels

  • Understanding the durability issues: Deterioration of concrete lining, contraction and leaks
  • Addressing corrosion through periodic maintenance and surface coatings
  • Building durability as a risk factor in design: Needs and methods

Dr Kim
Sang Hwan, Director
KOREAN GEOTECHNICAL SOCIETY

09:50 Steel Fibres In Precast Tunnel Segment Linings

  • Performance criteria and design aspects of SFRC
  • Segmental lining design with SFRC
  • Benefits and cost savings associated with steel fibre reinforcement
  • Project references and case histories

Dr.-Ing. Ralf Winterberg
Business Development Manager
MACCAFERRI ASIA

10:30 Morning Tea & Networking Break

11:00 Design, Construction And Safety Features Of The World’s Longest Immersed Tunnel: Case Study – Femharn Belt, Denmark - Germany

  • Complying with new traffic data and pollution emission standards
  • Comparing EuroTAP and with other tunnel design benchmark
  • Challenges in designing the longest (20 km) immersed tunnel: How to overcome?
  • Analysing the different options: comparing immersed tunnel against bridge solutions

Axel Emil Christenson
Market Director – Tunnels
RAMBOLL

Rikke Juul Gram
Project Architect (Femern Belt Tunnel)
Schonherr

11:40 Fläkt Woods: Trends And Best Practices In Long Tunnel Ventilation

Dr Geoff Sheard
Vice President - Fan Technology
Flakt Woods

12:20 Embracing Public Needs In Constructing The West-East Strategic Road Tunnel In The North Shore Of Hong Kong Island: Case Study - Central - Wan Chai Bypass And Island Eastern Corridor Link Project

  • Constraints to cut and cover tunnel construction including legal considerations under the Protection of Harbour Ordinance and temporary relocation of vessels in the Typhoon Shelter
  • Constraints to mined tunnel construction including protection to existing Cross Harbour Tunnel
  • Key principles governing construction
  • Use of construction modelling and control services to control programme and detect activity clashes

Kwok Wah LO
Chief Engineer - Major Works Project Management Office
HIGHWAYS DEPARTMENT, HKSAR

13:00 Lunch & Networking Break

14:00 Controlling Design And Construction Costs Of The World’s Largest Double-Deck Road Tunnel: Case Study - Chongming Tunnel

  • Understanding interactive behaviours of soil, rock and water for cost control
  • Costing based on design codes and tunnel construction method used
  • Risk analysis and cost overrun parameters: What needs to be watched out for?
  • Types of construction costs and mitigating risks involved

Joseph Lo
Executive Director - Transportation
AECOM

14:40 Modern Trends In Design And Construction Of Long Sewerage Tunnels: Case Study – Tseun Wan Drainage Tunnel Project

  • Dredging and tunnel element construction processes
  • Techniques in transporting, immersing and docking of tube tunnel elements
  • Designing for immersed tube tunnels’ floatation effect
  • Strategies for constructing very deep immersed tube tunnels

Christopher Shaw
Project Director – DSD Tunnel
MAEDA CORPORATION

15:20 Afternoon Tea & Networking Break

15:50 3D Numerical Modelling Of Urban Tunnel Construction Near Piled High-Rise Buildings

  • Techniques in construction of tunnels near existing property lines
  • Modern design and construction processes considering piled structures
  • 3D numerical analysis for shafts, portals and openings with respect to tunnel excavation

Dr Siew Wei Lee
Associate Director
GEOTECHNICAL CONSULTING GROUP

16:30 Enhanced Traffic Control And Monitoring Systems For Transportation Tunnels: Case Study – Delhi Metro Tunnels

  • Integrating fibre-optic control and monitoring systems for existing and new tunnels
  • Benefits of modern traffic control and monitoring systems: What have we learnt?
  • Trends in integration of automatic and semi-automatic controlled equipments
  • Managing traffic through advanced systems: Cost and benefits

Mohan Gupta
Divisional Director – Metro & Civil Geotechnical
MOTT MACDONALD

17:10 Chair’s Summary With Q&A End Of Day One Presentations