24 - 25 November, 2010, Harbour Grand, Hong Kong
Register by 13 August 2010 and receive up to USD 750 off!
Special Government Pricing Available! Click here for more information
Download the Brochure
Click here to view Past Presentations and Video Interviews
Become a Construction IQ Member and receive our weekly newsletter!
Learn more about sponsor & exhibit opportunities
Mark Your Calendar
Tell a Colleague
(includes lunch and tea breaks)
Rationale:
The cost of tunnel infrastructure, as against bridges, is considered usually higher. Better design standards, technologies in construction and safety standards increase the outlay for the asset owners and developers. Therefore, developing economical and sustainable options in tunnel engineering will make subsurface infrastructure a more viable and attractive option. This interactive masterclass will highlight how this objective can be achieved.
Discussion Points:
About the Facilitators:
Mr. Lo is currently an Executive Director of AECOM Asia. He has 28 years of experience in tunnel, geotechnical and civil engineering in Hong Kong, China, Asia and North America. He is also an expert in immersed tube tunnelling, C&C tunnel and drill & blast tunnel. The current tunnelling projects under Ir. Lo’s management are Express Rail Link bored tunnels, Hong Kong – Zhuai – Macau bridge IMT tunnel, Chennai Metro Rail Project Phase 1, Kolkata Metro Rail East-west Line, MTRC West Island Line C703, Guangzhou Zhoutouzui Immersed Tube Tunnel, HATS Stage 2a tunnels, Hong Kong West Drainage Tunnel, Lai Chi Kok Transfer Scheme, etc.
Alexander (Sandy) Mackay is a Technical Director with the Snowy Mountain Engineering Corporation (SMEC) in Hong Kong. He is a Chartered Civil and Mining Engineer with 25 years professional engineering experience practicing in Hong Kong, United Kingdom, Australia, Russia, Vietnam, Spain, China and the Middle East. His particular expertise includes the project management, design and construction of major civil engineering projects including from sub-surface excavations and oil and gas pipelines. Projects include the tender preparation of the Drainage Service Department HK West, Tsuen Wan, Lai Chi Kok and Harbour Area Treatment Schemes; detailed design of the Adelaide desalination plant, Australia and team leader assessing geo-hazards impacting the 24 Billion US$ Sakhalin oil and gas pipeline project, East Russia.
[ Register Now ]